Design of a Hybrid Power Generation System for a Remote Area in Bangladesh Combining Solar & Wind Power
Shantu Ghose1, Debangshu Barua2, Ashab Uddin3, Animesh Roy Chowdhury4, Stabak Das5

1Shantu Ghose, working as an Asst. Engineer of Operation at Energis Power Corporation Ltd. (55MW), Shikalbaha, Chittagong, Bangladesh.
2Animesh Roy Chowdhury, working as a Maintenance Engineer at KAFCO (Karnaphully Fertilizer Company Ltd.), Anowara, Chittagong, Bangladesh.
3Stabak Das, an Asst. Inspector of Electrical Safety Inspection in Woosun Energy & Construction Co., Ltd., Dhaka, Bangladesh.
4Debangshu Barua, working as a Management Trainee (Electrical Maintenance) at YOUNGONE (CEPZ), Ltd., Bangladesh.
5Ashab Uddin, working as a Assistant Engineer at Pacific Jeans Ltd., (CEPZ), Chittagong, Bangladesh
Manuscript received on July 19, 2014. | Revised Manuscript received on July 20, 2014. | Manuscript published on July 25, 2014. | PP:12-15 | Volume-2 Issue-9, July 2014. | Retrieval Number: I0776072914/2014©BEIESP

Open Access | Ethics and Policies | Cite
© The Authors. Published By: Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: This project aims at designing an off grid solar-wind hybrid system for a remote locality. First of all, availability of solar and wind resources for a particular location in Chittagong has been checked. According to the solar irradiance and wind speed data Parki Sea Beach has been chosen as project site which is situated in Gahira, Anwara thana under southern part of Chittagong, Bangladesh. Different combinations have been selected by using HOMER in order to find minimized solution considering both cost and electricity production
Keywords: Hybrid Power System, HOMER, Weibull function.